Overview

The Final Report is a collection of documentation that summerizes all design activities of all members of the team, team roles and task roles.

Guidelines on Final Report

A template is provided in your task force’s shared Feishu folder as a Feishu Doc, which can be simultaneously edited by all members on the browser as a collaborative effort. Don’t worry about making changes to the document, as you can access historical versions of the final while preparing it.

  • General:
    • Report Name: [ME303] Final Report by [Red/Green/Blue/Yellow] [Apple/Banana/Cherry]
    • Submitted by: @ System Integrator
    • Reviewed by: All members of the team
    • Date & Version: YY-MM-DD-V1.0
    • [Proper use of document style is highly recommended to stay the file organized.]
    • [Use the build-in Print function of Feishu Doc to save it as PDFs before making the submission.]
  • Project Overview [System Integrator & Information Officer]
    • Motivation and Need
    • Design Challenge
    • Key Outcomes
    • Team Reflections
  • Team Roles [System Integrator]
    • List of all members & roles
    • Team Roles
    • Task Roles for [Red/Green/Blue/Yellow] [Apple] on [Machine Type]
    • Task Roles for [Red/Green/Blue/Yellow] [Banana] on [Machine Type]
    • Task Roles for [Red/Green/Blue/Yellow] [Cherry] on [Machine Type]
    • Teaching staff to your team
  • Budget & Codes [Financial Officer]
    • Code of Ethics
    • Budget Report
  • Team Operation
    • Safety Measures & Risk Management [Safety Officer]
    • Tool Management [Tool Officer]
    • Site Management [Team Site Master]
    • Team Communication [Yoda Officer]
  • Task Force [Red/Green/Blue/Yellow] [Apple] on [Machine Type]
    • (Updated) Design Need Report [Design Engineer]
    • (Updated) Engineering Feasibility Report [Feasibility Engineer]
    • (Updated) Fabrication & Assembly Report [Fabrication Engineer & Assembly Engineer]
    • (Updated) Testing & Optimization Report [Test Engineer]
  • Task Force [Red/Green/Blue/Yellow] [Banana] on [Machine Type]
    • (Updated) Design Need Report [Design Engineer]
    • (Updated) Engineering Feasibility Report [Feasibility Engineer]
    • (Updated) Fabrication & Assembly Report [Fabrication Engineer & Assembly Engineer]
    • (Updated) Testing & Optimization Report [Test Engineer]
  • Task Force [Red/Green/Blue/Yellow] [Cherry] on [Machine Type]
    • (Updated) Design Need Report [Design Engineer]
    • (Updated) Engineering Feasibility Report [Feasibility Engineer]
    • (Updated) Fabrication & Assembly Report [Fabrication Engineer & Assembly Engineer]
    • (Updated) Testing & Optimization Report [Test Engineer]
  • Final Remarks [All members]
    • A full production line in DesignAIR simulation and an actual production line built as the alpha prototype.
    • Reflections of the production towards the wasteless project theme.
    • Discussion of the limitations of the production line
    • Suggestion to move forward on control and integration towards a working production line.
    • Reflections by each team member on the learning experience and recommendations to improve the learning experience.

Guidelines on Final Presentation

  • Final Presentation [Video Log Officer]
    • A 3-minute video presentation of their project learning experience and achievements.
    • A 10-min presentation, with the Video Log Officer taking the lead in the PowerPoint preparation, assisted by all members of the team.
    • A total of three members are to be elected by the team to present.