Overview

This week is the deadline for the first Machine Design Report, based on this report from each task force, we will be working together towards a set of machines towards the wasteless production line. Although we planned to move all students into the New Engineering Building during this week’s class, we are still waiting for the final approval from the University President. In the meanwhile, our team of teaching staff is working very hard to refurbish the new classroom with machines, tools, and equipment for your learning experience. Nevertheless, look forward to your design need report and can’t wait to see your exciting designs and teamwork.

Be sure to review Instructions for Peer Review with more details, following steps below:

  • Go to your team’s webpage (password protected)
  • Scroll down to the 10. Peer Review section
  • Open the Peer Review Submission page in a new tab
  • Click through the submitted 2-page design notebooks and share your review, 1 task force at a time
  • Each student needs to submit the form 3 time to complete the review of all task forces within your team
  • Don’t forget to evaluate yourself
  • If no student role is allocated, or no link provided for that student, type 0 for the marking

Lecture on Monday

Lab on Wednesday / Friday

  • As recommended by Guo Weijie, each team can take 10~15 mins to share your Design Need Report using Feishu Doc Presentation Mode and receive on-site feedback from the lab instructor (NO NEED TO PREPARE A SEPARATE POWERPOINT).
  • Hand-in your design notebook for signature and review by the lab instructor
  • Discuss with all members in your task force and team to work on the machine design report

Workshop on Wednesday / Friday

  • As recommended by Guo Weijie, each team can take 10~15 mins to share your Design Need Report using Feishu Doc Presentation Mode and receive on-site feedback from the workshop instructor (NO NEED TO PREPARE A SEPARATE POWERPOINT).
  • Hand-in your design notebook for signature and review by the lab instructor
  • Discuss with all members in your task force and team to work on the machine design report

Deliverables